
Total Capacity
Total Land Area
This new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.
This grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.
2028 Substation Energization
IN DEVELOPMENT
